I got a lot of the wiring done over the summer with my step dad, Warren. The insulation went in over Thanksgiving and now I have a guy helping with infloor (and ceiling) heating. The ceiling had to have the tubing in the ceiling because it’s on its own thermostat and the volume to surface area ratio is high to get heat by the floor alone. It will be interesting to see how this works out.
Search the site
Blogs
Links
Site stuff
Pages
Archives
- May 2010
- April 2010
- March 2010
- February 2010
- January 2010
- December 2009
- November 2009
- October 2009
- September 2009
- August 2009
- July 2009
- June 2009
- October 2008
- September 2008
- August 2008
- July 2008
- June 2008
- May 2008
- December 2007
- October 2007
- September 2007
- August 2007
- July 2007
- May 2007
- April 2007
- January 2007
- October 2006
- September 2006
- August 2006
- June 2006
- May 2006
- November 2005
- September 2005
- August 2005
- July 2005
- June 2005
- September 2004
- September 2003

